I found that all staff, from senior administration down to site personnel were committed to delivering a great product in a professional manner. Over the past 6 years, we have overseen 4 multi-million dollar projects with various contractors and JEN COL was definitely the best one. I am hoping to work with JEN COL on future projects and would strongly recommend them to my collogues.
Location
Morinville, Alberta
Client
Greater St Albert Roman Catholic School District
Size
3,158m²
Value
$10.1 million
Completion
July 2020
St. Kateri Tekakwitha Academy is a new pre-K to Grade 5 school constructed on a greenfield site in the new Westwinds subdivision in the Town of Morinville. It is the first school the Greater St. Albert Catholic School District has built in the Town since Morinville Community High School opened in 1994. The Academy addresses current and future growth at the elementary level and includes a sports academy focusing on gymnastics, cheer, dance and hockey, with a strong emphasis on academics.
This 3,158m² facility has been designed and constructed to meet LEED® Silver with capacity for 350 students. A unique—and sustainable—feature of the Academy are the solar panels on the exterior and interior of the building where students can use mobile solar panels and software as part of lessons on tracking energy production and use.
The school’s main hall gathering space for students and staff has a wood-patterned floor and ceiling to resemble an Indigenous longhouse, and the front office is brown to reflect St. Kateri’s artisan skills as a basket weaver. The school’s grades are divided into three color-coded pods and classrooms in each pod have garage-door walls that spill into common areas when open.
Delivery Method
Stipulated Price
Architect
Group2 Architecture
Mechanical
Williams Engineering
Electrical
Williams Engineering
Structural
Arrow Engineering