Location: Kerrobert, SK
Delivery Method: Stipulated Sum Tender
Status: December 2013

Project Information:

Existing pump stations for Enbridge needed an addition due to the influx of product needed to be transported cross country and in preparation for additional pipelines such as Keystone. Jen-Col was the contractor for the Early Civil portion of the work and self-performed all the concrete worked required for these additions for pours upwards of 100 m3 at a single time. When Jen-Col completed the Early Civil portion of the work all site grading, concrete work and piling was completed and ready to receive the engineered steel building, piping, and pumps.

SHARE THIS PROJECT
color
http://jen-col.com/wp-content/themes/yunik-installable/
http://jen-col.com/
#f67f17
style1
scrollauto
Loading posts...
#555555
on
none
loading
#555555
Sort Gallery
http://jen-col.com/wp-content/themes/yunik-installable
on
yes
yes
off
off
Newsletter Input text
off
off